(Pictured above: the site of the future 103 Street Playground.)

103 Street Playground

Summer/Fall 2021 –  New Playground for 103 Street Park 

A brand-new playground is coming to the 103 Street Park this spring and summer. The previous playground had been removed in 2019 too allow for the construction of a new water reservoir, with that project completed the next step is to return a playground to the park.

The design of the park is currently under development. In the winter of 2020 a neighbourhood survey was made available to help determine design elements. Those results have been compiled and we are are currently in the process of tendering a design for the new playground. Once the design has been finalized installation of the new playground will begin.

A copy of the site plan is available below, the park concept will be made available here once it is complete.

Page last updated April 30, 2021