Closing Date
The Work for 101 Street Storm Sewer is to upgrade a portion of the existing infrastructure. Clean and inspect the remaining infrastructure to the outfall location. Repair and upgrade slope failures and repair the asphalt road damaged by the slope failure.
RFP documents are included below:
Posting (MM/dd/yyyy): | 08/18/2023 05:25:06 PM Alberta Time |
Closing (MM/dd/yyyy): | 09/01/2023 02:00:00 PM Alberta Time |
Tendering Authority Contact Information
Alisha Mody, Manager of Planning & Development
amody@peaceriver.ca
780-624-2574 ext. 1027