Updated September 14, 2023

The Town has been monitoring the storm sewer behind the Points West building on 99th Street (River Road) which has failed and requires repair.

On September 1, 2023, a public tender closed for work to address the storm water and superficial washout damage. No construction bids were submitted to the Town of Peace River for the scope of work that was posted.

The Town is actively working with the project engineering consultants to come up with a plan to get the road opened back up and damaged infrastructure repaired as soon as possible, including reaching out to interested contractors who declined to submit pricing for the work to address outstanding concerns.

Project Tender

Tender: 101 Street Storm sewer

Information Presented to Council

August 2023 Briefing Note
November 2022 Briefing Note
July 2022 Briefing Note

Public Information Posts

September 2023 What’s New for 101st Street? – Town of Peace River
August 2023 101st Street in the South End – Town of Peace River