The Town of Peace River is seeking a qualified proponent to complete the development of the 99 Avenue West Trail.

The scope of work for this project shall include but is not limited to the following:

  • Common Excavation
  • Remove and Reinstallation of Existing Rip-Rap
  • Asphalt Concrete Pavement
  • Installation of Corrugated Steel Pipe (CSP)
  • Installation of New Signs
  • Topsoil & Seeding

Unless otherwise specified, the Contractor shall supply all materials necessary to complete the Work. A complete job is called for. Therefore, any labour, material, equipment, tools or incidental item not specifically mentioned, but necessary for completeness will be considered incidental to the work and no separate or additional payment will be made.

To submit an expression of interest, and review all pertinent project documents, please visit:
https://vendor.purchasingconnection.ca/Opportunity.aspx?Guid=9ca75d5b-d971-fc65-1790-39c2ed490000&

Reference No: AB-2024-02296
Solicitation No: TPR2024002

Posted: March 21, 2024
Closing: April 11, 2024