Over the next week, our Public Works crews will be busy around town with the following:

  • Sidewalk panel replacements in Lower West Peace.
  • Completion of the concrete walkway into the cemetery.
  • Saddleback Park construction support.
  • Curb and gutter concrete formwork for paving projects.
  • Pothole patching.
  • Fire hydrant winterization.
  • Downtown beautification: installation of downtown benches, garbage cans and bike racks as time permits.
  • Repair of asphalt from winter water breaks, including Main Street, is underway. Work to be completed by the end of the month.