IFT: Reservoir 365 Replacement and Demolition

IFT: Reservoir 365 Replacement and Demolition

Posted July 19, 2019
Addendum 1 and 2 added July 26, 2019
IFT Deadline changed to 2pm August 22, 2019
Addendum 3 and 4 added August 15, 2019
Addendum 5 added August 22, 2019

The Town requests quotations from parties interested in the Replacement and Demolition of Reservoir 365.

Closes 2 pm August 22, 2019

IFT: Reservoir 365 Replacement and Demolition (PDF – 466KB)

IFT: Technical Specifications (PDF – 19MB)

IFT: Design Drawings (PDF – 72MB)

Appendix A: GEOTECHNICAL REPORT (PDF – 3MB)

Appendix B: PRE-DEMOLITION HAZARDOUS MATERIALS SURVEY (PDF – 13MB)

IFT: Addendum 1 (PDF – 740KB)

IFT: Addendum 2 (PDF – 24KB)

IFT: Addendum 3 (PDF – 163KB)

IFT: Addendum 4 (PDF – 29KB)

IFT: Addendum 5 (PDF – 21KB)