Shaftesbury Trail Underpass Reopened

Closure of Shaftesbury Trail Underpass

April 30, 2019

Bridge Contractors have reopened the Highway 684 (Shaftesbury Trail) underpass. They have also closed the 90 Street underpass.
There are likely to be flag people, please exercise caution driving through construction zones.

January 11, 2019

Bridge contractors have informed us that they are intending to close the Shaftesbury Trail Highway 2 underpass on Monday, January 14 following rush hour. A detour route will be open, drivers will be able to use 90 Street along the riverbank to access the industrial park and Terrace Trailer Court.

The traffic switch is dependant on bridge construction scheduling and may change slightly. However, please allow some extra time and watch for possible detour signs.

The closure is to facilitate the demolition of the pre-existing highway overpass and the construction of the new one and will be in place until further notice.

View Traffic Accommodation Strategy (PDF – 1MB)